Block 16

Corporate Project

We worked on the project for 9 months and had a great time with this project! This project had a very detailed exterior wall framing. A lot of coordination and communication was required between our foreman for the window and masonry work. 

block 16 exterior

About

THE PROJECT

Location: Milwaukee, WI

Scope of Work Performed: Cold Formed Metal Framing, Interior Metal Framing and Gypsum Board Core, as well as the 4th and 5th floor build out.

General Contractor: Miron Construction

View

PROJECT GALLERY

RETURN TO ALL PROJECTS